Thermal Inspection of Solar Arrays at a Municipal Wastewater Treatment Facility

Our client was a publicly contracted solar operations firm managing renewable energy systems at municipal facilities. In this case, they oversaw a 1.2 MW ground-mounted solar array installed at a wastewater treatment plant in Northern California. The site supported a city of 100,000+ residents and operated continuously, with a solar array powering 60–70% of the facility’s electrical load. The EPC/O&M team had about 40 personnel and maintained renewable systems at six public works sites across the region.